Engineering & Maintenance

Filters
Engineering & Maintenance

Meeting and banquet arrangements shall allow for physical distancing between guests based on WHO recommendations. All recommended cleaning and sanitization protocols should also be enforced in these spaces.

Monitor air quality regularly

Monitor the casualty rate in the kitchen and note whether accidents happen over a long or short period of time

Never wedge fire doors open. Fire doors must close automatically in the event of a fire

Operate steam boilers at two pressure levels – at higher pressure during laundry operation and at lower pressure for the kitchen, hot water and heating when the laundry is not operating

Optimize boiler systems by pressurizing the make-up water tank

Optimize boiler systems by using an economizer/air preheater

Optimize boiler systems by using an oxygen analyzer

Optimize boiler systems through blowdown optimization

Organize work to reduce noise by limiting duration and intensity of exposure, and appropriate work schedules with rest periods

Physical working environment factors such as factors relating to buildings and equipment, indoor climate, lighting, noise, radiation and the like shall be fully satisfactory with regard to the employees’ health, environment, safety and welfare

Prepare a comprehensive health and safety plan inside the hotel by taking into account all the different sectors of the hotel with all the potential risks

ESTP © Egyptian Sustainable Tourism Portal. All rights reserved.   Made by Noshor Media